| Ongoing Projects |
|
| Details Of Work On Hand |
|
| Construction of Dams : |
|
|
Construction of SHELGAON BARRAGE on Tapi River near Village Jalagaon (Under JV: Avantika 40%), Name of employer: Executive Engineer, Girna Canal Moderisation Division No -2, Jalgaon, Maharashtra. work in progress. |
|
| Construction of Tunnels |
|
Construction of a Tunnel including construction of head regulator and approach channel of Veligonda Project in Prakasham District including all allied works duly obtaining necessary permission from the Govt. of India (EPC Turnkey Basis) Under Subcontract(25%)-work in progress. |
|
Package No.66: Investigation, soil exploration, preparation of design, drawings and estimation for the construction of Tunnel of about 890m long, Saddle Dam “KL” , off - Regulator left including its connectivity’s of INDIRA SAGAR PROJECT (Polavaram project) in Andhra Pradesh Value of work Rs.90Crores (with JV 50-50) - work in progress. |
|
Package No.6: Investigation preparation of HPs, Design and drawings, excavation and construction of Tunnel in Complete shape including lining on HNSS main canal from km285.100 to Km287.100 under phase-II, Employer: Superintending Engineer, HNSS Circle no.3 Madanapally, Andhra Pradesh - work in progress. |
|
|
Package No.10: Investigation preparation of HPs, Design and drawings, excavation and construction of Tunnel in Complete shape including lining on HNSS main canal from Km358.500 to Km360.000 under phase-II, Employer: Superintending Engineer, HNSS Circle no.3 Madanapally, Andhra Pradesh - work in progress.
|
|
|
Package No.15: Investigation preparation of HPs, Design and drawings, excavation and construction of Tunnel in Complete shape including lining on HNSS main canal from Km 412.600 to Km 415.000 under phase-II, Employer: Superintending Engineer, HNSS Circle no.3 Madanapally, Andhra Pradesh – work in progress.
|
|
| Construction of Town ship |
|
|
Construction of Civil, Structural, Architectural and electrical work of entire township of different type of quarters, Club house, community centre, shopping complex, bachelor hostel, sub-station, raw water reservoir, pump house etc Package-II for 1X125MW Lignite Based Thermal Power Plant at Giral, Stage –II in Barmer, Rajasthan Employer: TATA Projects Limited, Suryodaya, 1-10-60/3, Begumpet, Hyderabad. - work in progress.
|
|
| Canals |
|
|
Package No.5 Conducting Detailed Investigation, Preparation Of Hydraulic Particulars, Designs, Engineering, Preparation Of Estimates and Excavation Of Main Canal , Formation Of Main Canal Including Canal Lining and Construction Of Cm & Cd Works From Km 93.70 To Km 111.00 Of Lmc Of Indirasagar Project (Under Subcontract 100%) - work in progress.
|
|
| Construction of Balancing Reservoir |
|
|
Investigation, designing and construction of Sri Narasimharaya Sagar
(Gorakallu balancing resorvoir) with a live storage of 10.29 TMC of F.R.L (+)
261 M with over flow arrangements to discharge 848cumecs of surplus water,
in take canal wirh a flood flow discharge of 140.45 cumecs and an outlet
arrangements for a discharge pf 67.96 Cumecs to connect SRBC near
Gorakallu Village, Panyam Mandal in Kurnool District, Andhrapradesh on
EPC Turn Key System (Subcontract) Avantika Share 50%.
|
|
Development and operation Hydro Power Projects. |
|
Coal Mining and Handling. |
|
Manufacturing of Safety & Security products to Defence and Paramilitary forces.
|
|
|
|
|
|